Critical Infrastructure

Substation Physical Security 2023 (4,100 LF Perimeter)

Anti-climb security fence with barbed topper at sunset
Anti-climb security fence with barbed topper at sunsetSubstation perimeter security fence 1Substation perimeter security fence 2Substation perimeter security fence 4Substation perimeter security fence 5Substation perimeter security fence 6Substation perimeter security fence 7Substation perimeter security fence 8Aerial view of a hydroelectric powerhouse on a riverAerial view of a substation perimeter security enclosureCrash rated barrier gate at a controlled site entrance
LocationN/A
Project Size4,100 LF of 11' Fencing
Engineer/ArchitectZapata Group, Inc.

The Substation Physical Security 2023 (4,100 LF Perimeter) project for Idaho Power Company involved the installation of 4,100 linear feet of 11-foot-tall high-security fencing with a three-strand barb wire topper. The fencing included three double-drive, dual-slide 30-foot gates, as well as six personnel gates-three in the security fence and three in the chain-link fence. The project also featured 18 technology posts with lighting and 12 technology boxes. In addition to the fencing components, Langston self-performed the grounding installation.

← View all projects
Scroll to Top