Flood Protection 2022
Flood Protection 2022 1Flood Protection 2022 2Flood Protection 2022 3
LocationN/A
Project Size1,800 LF of Flood Mitigation at Energy Substation
ArchitectJohn R. McAdams Company

Substation Flood Mitigation Project Details: Installation of 1,800 LF of 6 foot concrete wall around Energy Substation along with approximately 490 feet of Armorflex along the bank of the river that runs near the project. The project also included 2 Presray floodgates, temporary fence, and temporary fence grounding, storm drain improvements, erosion control, and the use of a 1,000 LF temporary flood wall for diversion of heavy flows during flood conditions prior to project completion.

  • Site grading, erosion control, and site clearing
  • Installation of 2 Presray floodgates
  • Four storm drain structures
  • 139 LF of 15" PVC storm drain with 2 post indicator valves
  • 57 LF of 12" PVC storm drains
  • Temporary fence and temporary fence grounding
  • Two 24' wide chain link gates
  • Grounding for barb wire and chain link fencing
  • Foundation bearing improvements down to 10' deep for wall foundations
  • Coordination of concrete wall pours with line outages in two low line areas
  • Installation of 65' of foundation and wall in coordination with a power business outage